Post-calculation
Post-calculation determines the actual costs incurred after an order has been completed and compares them with the planned values. In SAP Business One, the analysis assigns the actual costs from material consumption and postings to a production order and shows variances as a plan-vs-actual comparison within cost accounting. A completed production order provides the basis for tracing and evaluating cost variances for each product clearly.